Skip to the page's content
Back to Projects

University of Glasgow Keystone Building

The latest addition to Careys’ University of Glasgow resume which already includes the Mazumdar Shaw Advanced Research Centre (ARC), Adam Smith Building, School of Health and Wellbeing and Infrastructure works between the buildings.

Client

University of Glasgow

Location

Glasgow

Principal Contractor

Multiplex

Our latest works at the Keystone Building include:

  • RC Core walls at Core 4 Level 6-7
  • Level 3 Pour 3 PT slab with drop beam.
  • Level 4 Pour 1 slab preparation ongoing
  • Zone 3 double height RC columns ongoing
  • Installation of precast stairs to Core 3 ongoing
  • Level 3 Pour 4 falsework construction ongoing
  • Level 7 PT Slabs 
  • Core 4 precast installation and striking out falsework level 6

 

The project will accommodate a range of dry and wet lab spaces as well as high-spec computing labs and general teaching facilities. The Keystone building will be the University’s most sustainable building as well as being its second largest, and was designed to achieve the BREEAM Excellent sustainability standard. The building will operate with an 80% reduction in energy use compared to other research-lab buildings. The actual construction of the Keystone Building has been centred around using low-carbon, circular materials such as timber systems and low cement concrete.

Careys requires statistics and marketing cookies to display this content. .

The Keystone Building

Our latest project update from the Keystone Building in Glasgow.

Project Update

Related projects

See more of our work like this