All England Lawn Tennis Club (AELTC), Basement box

Careys were appointed to carry out earthworks, the basement box substantial reinforced concrete works and diaphragm waterproofing at AELTC’s Somerset Road facility in Wimbledon.

Client

All England Lawn Tennis Club (AELTC)

Location

Wimbledon, London

Principal Contractor

Willmott Dixon

Construction site with yellow tower cranes, concrete foundations, and partially built structures. Residential houses and trees visible in background under clear blue sky.

The redevelopment of the Somerset Road practice court complex has been on-going since August 2018. Careys have already undertaken the enabling works, which included the diversions of Thames Water sewers, construction of TX14 substation and the construction of a private drainage network, which includes an attenuation tank, harvesting tank and flow control structure which allows water to be discharged into the Thames Water sewers in a controlled outflow.

Aerial view of construction site with concrete foundations, steel reinforcement bars, orange excavators, and residential houses nearby.

The earthworks scope includes the bulk excavation of the basement, including any necessary temporary excavations needed to complete our concrete works. Careys will also be responsible for excavating the trenches in order to complete the installation of chiller pipe works.

Concrete frame construction will be for levels 01, 02 and 03 horizontal and vertical elements, including any temporary works – including falsework, formwork, back-propping, lifting equipment and any pumping equipment that may be required – and will also include diaphragm waterproofing.

Related projects

See more of our work like this

Accessibility Settings

Text

Applies the Open Dyslexic font, designed to improve readability for individuals with dyslexia.

Applies a more readable font throughout the website, improving readability.

Underlines links throughout the website, making them easier to distinguish.

Adjusts the font size for improved readability.

Visuals

Reduces animations and disables autoplaying videos across the website, reducing distractions and improving focus.

Reduces the colour saturation throughout the website to create a more soothing visual experience.

Increases the contrast of elements on the website, making text and interface elements easier to distinguish.