Skip to the page's content
Back to Newsroom

Midfield Stands Development - Edinburgh Airport

Our team are delivering the Midfield Stands Development, situated in the heart of the live airfield, for our client Edinburgh Airport.

Posted by Careys

Thursday 29th January 2026

Share via

The project involves the construction of five Code C stands with associated taxiway infrastructure. This development will increase aircraft parking capacity and allow the airport to decommission existing stands to support the Terminal Infrastructure Expansion (TIE) and future capacity requirements.

Works involve laying PQ (Pavement Quality) concrete, a high-strength, durable concrete used in heavy-duty pavements such as highways, airport runways, and industrial areas. It is specifically designed to meet stringent strength and workability requirements.

Material Quantities include:
• PQ Concrete: 15,194 m³
• Wet Lean Concrete: 4,644 m³
• Type 1 Sub-base: 4,644 m³
• Capping Layer: 22,123 m³

Posted by Careys

Thursday 29th January 2026

Share via

Accessibility Settings

Text

Applies the Open Dyslexic font, designed to improve readability for individuals with dyslexia.

Applies a more readable font throughout the website, improving readability.

Underlines links throughout the website, making them easier to distinguish.

Adjusts the font size for improved readability.

Visuals

Reduces animations and disables autoplaying videos across the website, reducing distractions and improving focus.

Reduces the colour saturation throughout the website to create a more soothing visual experience.

Increases the contrast of elements on the website, making text and interface elements easier to distinguish.