22 Bishopsgate

Careys delivered concrete works at 22 Bishopsgate, London’s second tallest building, using a self-erecting jumpform system - the first of its kind to be used in the UK - to construct the two concrete cores. Overall, this complex superstructure project required our team to pour 58,000m3 of concrete and use of 7,500 tonnes of reinforcement.

Client

Lipton Rogers Developments LLP

Location

London

Principal Contractor

Multiplex Construction Europe

22 Bishopsgate is a mixed-use development in London’s Financial District, at an impressive 278m tall, comprising 62 storeys, and with a floor space of 1.4m ft2. The building will be the home up to a 100 companies with a public viewing gallery at the top, alongside a two-storey restaurant and bar.

Our in-house design team worked at pre-contract stage to develop a strategy that enables the core structures of 22 Bishopsgate to be built simultaneously to demolition works and the construction of the basement.

Our team used a self-erecting jumpform system - the first of its kind to be used in the UK

The building was constructed using a unique jumpform methodology, utilising a rig of a scale and design not previously used in the UK. Jumpform rigs are complex moving structures, with the one used at Bishopsgate needing to be operational from day one of the programme to enable rapid construction of the tower.


Our design team was engaged as lead designer and architect for the rig, worked with the specialist rig designer, principal contractor and the Careys onsite team to develop the design and adapting it to meet UK requirements.

Due to the tight site footprint, and central location, construction involved an off-site consolidated delivery centre outside central London to minimise vehicle movements to the site – reducing pollution, improving security and avoiding cyclist accidents with HGVs.

Supplies to, and waste from, the building were delivered to the consolidation centre and energy efficient vehicles made far fewer deliveries to the site outside peak pedestrian movement and rush hour times.

22 Bishopsgate is designed to achieve a BREEAM Excellent rating and a 25% carbon saving, partly due to the triple glazed ultra-efficient façade.

Our planning and logistics team devised a programme that minimised vehicle movements and deliveries to site, reducing pollution and vehicle movements in this already congested part of London.

Related projects

See more of our work like this

Accessibility Settings

Text

Applies the Open Dyslexic font, designed to improve readability for individuals with dyslexia.

Applies a more readable font throughout the website, improving readability.

Underlines links throughout the website, making them easier to distinguish.

Adjusts the font size for improved readability.

Visuals

Reduces animations and disables autoplaying videos across the website, reducing distractions and improving focus.

Reduces the colour saturation throughout the website to create a more soothing visual experience.

Increases the contrast of elements on the website, making text and interface elements easier to distinguish.