Careys initial works on this project involved groundworks to accommodate a 16,0000m2 extension to the existing building. From here our scope of works evolved to include the construction of a fuel storage block, an air lock, offices, an assembly delivery area, a 7,000m2 concrete service yard, a 3,500m2 concrete pallet park, an extension to the loading bay (adding 4 new decks) and a 5,000m2 car park. In addition, five roads were reconstructed to form 1.1km of main production roads.