Royal Mint Gardens

Careys was awarded the design and build contract to construct a precast encapsulation structure over the existing Docklands Light Railway (DLR) lines at Bank Station exit tunnel. The completed structure extended for 150m from the tunnel face, where our detailed pre-construction project planning was crucial to ensuring safe working in the live rail environment, overcoming tight site boundaries at one of London’s busiest interchange stations.

Client

Royal Mint Gardens

Location

Whitechapel, London

Principal Contractor

Careys

Construction site with railway tracks, cranes, and scaffolding under pink and blue twilight sky. Buildings and trees visible in background.

Our team constructed the encapsulation structure including piled foundations, precast concrete wall panels, along with a precast T-beam roof structure. We were also responsible for the construction of new escape platforms within the encapsulation structure, along with diversion and installation of services. Our team also constructed a dedicated mechanical room on top of the encapsulation, housing smoke evacuation fans to service the tunnel in the event of a fire on the DLR.

We also part-demolished the local underground railway viaduct as part of the enabling works for the site. The overground structure was retained and remained in use during the demolition. To prevent impact upon the live railway, we undertook real-time monitoring of engineering works and overnight work on sensitive elements of work such as services.

Innovative technique enables piling works without disruption at one of London’s busiest interchange stations

In addition to the live environment and national rail viaduct, one of the site boundaries contained a section of London’s Cycle Superhighway, and the main entrance is situated on a one-way street. To overcome the potential risk to the public, our team implemented various measures, including careful traffic management, screens and auger protection to avoid spoil affecting the local area or railway, and the use of innovative piling techniques to avoid lateral pressure which could affect existing structures.

Our use of a cased secant piling technique has protected the existing live structure we are working alongside. This technique has enabled piling works within the tight site, whilst also ensuring accuracy of the constructed piles. Our use of this technique enabled the team to undertake piling works without causing disruption to the DLR schedule at one of London’s busiest interchange stations.

Services provided

Related projects

See more of our work like this

Accessibility Settings

Text

Applies the Open Dyslexic font, designed to improve readability for individuals with dyslexia.

Applies a more readable font throughout the website, improving readability.

Underlines links throughout the website, making them easier to distinguish.

Adjusts the font size for improved readability.

Visuals

Reduces animations and disables autoplaying videos across the website, reducing distractions and improving focus.

Reduces the colour saturation throughout the website to create a more soothing visual experience.

Increases the contrast of elements on the website, making text and interface elements easier to distinguish.