Careys was awarded the design and build contract to construct a precast encapsulation structure over the existing Docklands Light Railway (DLR) lines at Bank Station exit tunnel. The completed structure extended for 150m from the tunnel face, where our detailed pre-construction project planning was crucial to ensuring safe working in the live rail environment, overcoming tight site boundaries at one of London’s busiest interchange stations.