Skip to the page's content
Back to Sectors

Residential

Our teams have delivered an extensive number of basements, superstructures and landscaping projects for an array of premium residential developments across the UK

Principalplace2 drone

Our recent project at Perry Barr saw our team deliver a utilities and design and build infrastructure package at the Perry Barr Residential Scheme (PBRS) in Birmingham, which includes both the substructure and superstructure packages for Plot 6 which consists of 268 extra care apartments, restaurants, gym, village hall and shops spread across three blocks up to 9-storeys tall.

To enable residential developments we have successfully carried out a substantial amount of land remediation works on brownfield sites using our in-house remediation equipment to remove contamination, clearing the way for numerous developments across the UK. Recent projects include the 20 hectare site at the former Ford Dagenham, the 443 acre brownfield site at Barking Riverside and Watford Riverwell.

Additionally, our teams have delivered some of the country’s most iconic residential developments. These include luxury schemes at London’s Principal Place, Marble Arch Place and Nine Elms; converting One Palace Street - the grade II listed building opposite Buckingham Palace - into luxury apartments; delivering the infrastructure and enabling works for the multi-phase regeneration scheme at Graven Hill, the construction of high end apartments that include the canal side development at Manchester's Potato Wharf and developments at Moda Springside and Moda Holland Park.

In order to achieve the excellent standards, we demand of ourselves and promise to our clients, we use the latest construction techniques and employ robust health and safety protocols on all our projects.

Whether we are creating new builds or mixed-use properties, refurbishing or converting listed buildings, we are sensitive to the needs of the communities in which we are working – whether that involves specific traffic management, implementing measures to reduce noise, dust and vibration, working on a logistically constrained site, or tailoring our approach to the specific environmental requirements of an area.

Careys work on 22 Bishopsgate and Principal Tower has helped deliver the construction to two iconic towers in the heart of London. The complexity of both these projects needed a team willing to go the extra mile to understand and overcome the challenges whilst delivering world class results. The success of these projects is testament to the teams character, dedication and ability.

Director: WSP

Careys requires preferences and statistics cookies to display this content. .

Accessibility Settings

Text

Applies the Open Dyslexic font, designed to improve readability for individuals with dyslexia.

Applies a more readable font throughout the website, improving readability.

Underlines links throughout the website, making them easier to distinguish.

Adjusts the font size for improved readability.

Visuals

Reduces animations and disables autoplaying videos across the website, reducing distractions and improving focus.

Reduces the colour saturation throughout the website to create a more soothing visual experience.

Increases the contrast of elements on the website, making text and interface elements easier to distinguish.